Legislation Details

File #: RES-2024-031    Version: 1
Type: Resolution Status: Passed
File created: 12/15/2023 In control: Board of County Commissioners
On agenda: 1/24/2024 Final action: 1/24/2024
Title: RE: Restrictive Covenant - Motor Pool
Attachments: 1. Genesee Motor Pool - Approval of Compliance Plan, 2. Genesee County Motor Pool_EGLE Compliance Plan_08182023, 3. Genesee County Motor Pool Restrictive Covenant 111623
To: Delrico J. Loyd, Public Works Committee

From: Raymond Zanke, Director of Facilities and Operations

title
RE: Restrictive Covenant - Motor Pool

recommendation
BOARD ACTION REQUESTED:
Sign and Notarize the Restrictive Covenant - Motor Pool
BACKGROUND:
On October 3, 2019, Genesee County submitted a suspected release based on inventory records and petroleum odors. The dispenser that was detected to have the loss inventory was shut down and locked until it could be fixed. On October 7, 2019, Mid-Michigan Station Services (Mid-Michigan) was on-site to perform an inspection of Dispenser 2. Upon investigation, a very small leak was found and repaired at the dielectric union. On October 14, 2019, Atlas was on-site to collect soil samples below the dispenser. The dispenser had no sump. A soil sample was collected from below the dispenser and screened for the presence of Volatile Organic compounds (VOCs) using a photo-ionized detector (PID). The PID reading was at 5,000 parts per million (ppm). Atlas submitted the sample to Quantum Laboratories (Quantum) in Wixom, Michigan for Michigan unleaded gasoline parameters (ULG). On October 16, 2019, US Tank Alliance was on-site to test the dispenser, distribution lines, and tanks. The tests for all of these components passed. Atlas received the analysis from Quantum. Based on that data, a Confirmed Release Report was submitted to LARA. On October 18, 2019, LARA upgraded the suspected release to a confirmed release, with a release number C-0225-19.

On January 9-10, 2020, six monitoring wells were installed to evaluate the LNAPL release area. On January 31, 2020, all monitoring wells were gauged and groundwater samples were collected from monitoring well MW-2 via low-flow sampling procedure. All other monitoring wells could not be sampled because they were dry. The Initial Assessment Report was submitted to Michigan Department of Environmental, Great Lakes, and Energy (EGLE) on April 6, 2020.

On October 2020, Genes...

Click here for full text